LineControl
The control room of the Val Sorda Railway. One track, 63 km, fourteen stations. Every figure on this page comes from today's timetable, on Zurich time.




Line status
Train log
Our station clocks stop at the top of every minute and wait for the signal. It keeps all fourteen together.
The chart
Time runs left to right, distance bottom to top. Each line is one train. Steep means moving, flat means waiting. Where two lines cross, there had better be a loop.
Up to Sorda PassDown to Sorda BadPassing loopTap a line to pick a train
The climb
812 m to 2,091 m. The stretch from Alp Grisch to Furcletta is too steep for wheels alone, so the trains go onto the rack. Going down, they brake on their motors and send power back up the wire to whoever is climbing.
Departures
| Time | Train | To | Track | Status |
|---|

Why it's all on one track
In 1903 there was money for one. So two trains can only pass each other at a loop, and we have four.
The loops sit exactly thirty running minutes apart. That puts every crossing on the hour or the half hour, and the whole line repeats every sixty minutes.
If one train runs late, the other sits in the loop and waits. That's most of this job.
